top of page

Erosion and Water Run Off Control

This project included water and sediment basins along with grass waterways.

Constructed Basin

Year Completed:

2018

Major Watershed:

Sauk River

This immediate watershed that feeds into Horseshoe Lake had been dealing with erosion problems and water runoff control issues.  The landowner and Munson Township worked together with the Stearns CD to implement a series of conservation practices. This included three Water and Sediment Control Basins, a Grass Waterway and associated erosion control methods on the direct outlets.   


Components:

  • Basins

  • Waterway

  • Run Off Control


Benefits:

  • Sediment Reduction

  • Nutrient Reduction

  • Farming Efficiency


Pollution Reduction Estimates:

  • Phosphorus: 59 lbs./yr

  • Sediment: 59 lbs./yr


Partners on the project included the landowner, Stearns CD, NRCS, Sauk River Watershed District, Sauk River Chain of Lakes, and Munson Township.